skip to main content

The energy of the future

We design intelligent solutions for cost-efficient and sustainable energy use. Future-oriented and responsible. By using AI-supported, flexible solutions, we are your key point of contact to turn your projects into an economic and sustainable success.

Our components for your efficient energy system

Ready-to-use solar energy systems for installation on roofs or facades—from small systems to large-scale megawatt systems

Simultaneous supply of electricity and heat via combined heat and power plants, which can be operated with "green gases" (biomethane, H2) on request

As a stand-alone solution or as a hybrid system in combination with an intelligent combined heat and power plant

Residential, commercial, and industrial storage units (up to the multi-megawatt range) for self-consumption optimization, peak load capping, emergency power supply, and electricity trading

Charging solutions for electromobility in the commercial and public sectors, individually tailored to your project

Intelligent systems for operating your energy components

AI-based energy management solutions for commercial and industrial enterprises, including visualization of energy flows and system monitoring

Efficient system solutions that directly save unnecessary costs by avoiding or reducing peak loads

Automated, forecast-based optimization systems that can be easily integrated into your existing energy management systems

Innovative billing solutions for rental electricity, billing of heating and utility costs, heat contracting, and the charging infrastructure

Intelligent application solution for controlling opening hours, access controls, user groups, and charging tariffs, as well as for charging infrastructure reporting

Electricity trading solutions that enable you to trade energy efficiently and offer dynamic electricity tariffs

Top-level energy efficiency at BMW Group Plant 1.10

The Bachner Group implemented state-of-the-art medium-voltage technology and sustainable energy solutions for the new Plant 1.10 in Munich. This ensures a reliable energy supply and actively contributes to the BMW Group's energy efficiency and climate strategy.

Learn more

Energy reloaded: New construction of the FENECON CarBatteryReFactory

We installed comprehensive security technology in the CarBatteryRefactory—from fire alarm and access control systems to video surveillance. This ensures that all processes related to the reuse of vehicle batteries are reliably protected.

Learn more

Smart building technology for FIZ FUTURE

In the newly built BMW Group think tank, we demonstrated the full range of our capabilities: all electrical installations, the entire lighting system, control system technology, safety technology, and IT communication technology. All from the Bachner Group!

Learn more

New construction of the Willy Brandt Comprehensive School FOS

Since March 2023, Bachner has been extensively involved in the construction of this new five-story building. In the first of the three structures alone, we have laid 10 km of cable routes carrying 480 km of low-voltage cables and 600 km of extra-low voltage cables. It’s a major project in every sense of the word.

Learn more

Planning and switchgear construction for car manufacturing

Series production began at the BMW Group plant in Leipzig in March 2005: to date, over three million vehicles have been manufactured there. The plant has grown steadily over the years – in 2023, the Bachner Group was able to assist in the construction of a BMW Group production hall for high-voltage storage systems.

Learn more