Everything on schedule – thanks to our engineering expertise

Your projects will benefit from the very beginning: Our planning and engineering experts plan all orders with great passion and attention to detail. With our expertise, we are at your side from designing the implementation, construction, and installation plans all the way to the documentation. That’s good to know!

Planning & engineering by the experienced Bachner experts

Review of the implementation plan prepared by the engineering office and comparison with the service specifications behind the planning. Clarification of the feasibility of the construction plan. After successful coordination with the engineering office and the user, we start creating the construction and installation plans.

We handle all electrical execution plans according to your requirements and coordinate them with the various trades involved and their planners. This provides us the foundation we need to create the construction and installation plans more quickly. We thereby reduce the interfaces and project runtimes and enable you to meet your desired completion date.

Construction and installation planning creates a structured, smooth installation procedure and serve as the foundation for all trades to work together without any clashes at the construction site. Bachner P&E creates it based on the execution plan.

The technical inventory documentation, which provides a full description of the required services, is compiled on an ongoing basis in accordance with the building contractor’s delivery specifications. After completion of the work, we hand over the documentation to you in the format and scope you requested. This can also be in the form of a BIM model, which allows you to see all installations in 3D and track them down to the installed item.

Planning with a building information model involves all trades and persons involved in the project working digitally on a 3D model of a building under construction. This makes it possible to use and maintain the building efficiently later on during operation, all the way to optimized conversions and dismantling. Thanks to the transparency of the building’s digital twin, all the materials, components, and devices can be identified promptly and precisely. Even though this makes the extensive collision check for all installation systems much simpler, we still give it our full attention. This saves you and us time and money. That's how it should be!

Nowadays, no project, construction site, or order can be completed without a virtual project room. Whether on a mobile device, at the construction site, or in the office, it enables all project participants to communicate effectively in real time and access all relevant information about the construction project. This secures and accelerates the knowledge transfer and decision-making processes, and naturally also the progress of the construction project.

Planning and switchgear construction for car manufacturing

Series production began at the BMW Group plant in Leipzig in March 2005: to date, over three million vehicles have been manufactured there. The plant has grown steadily over the years – in 2023, the Bachner Group was able to assist in the construction of a BMW Group production hall for high-voltage storage systems.

Learn more

Top-level energy efficiency at BMW Group Plant 1.10

The Bachner Group implemented state-of-the-art medium-voltage technology and sustainable energy solutions for the new Plant 1.10 in Munich. This ensures a reliable energy supply and actively contributes to the BMW Group's energy efficiency and climate strategy.

Learn more

Smart building technology for FIZ FUTURE

In the newly built BMW Group think tank, we demonstrated the full range of our capabilities: all electrical installations, the entire lighting system, control system technology, safety technology, and IT communication technology. All from the Bachner Group!

Learn more

New construction of the Willy Brandt Comprehensive School FOS

Since March 2023, Bachner has been extensively involved in the construction of this new five-story building. In the first of the three structures alone, we have laid 10 km of cable routes carrying 480 km of low-voltage cables and 600 km of extra-low voltage cables. It’s a major project in every sense of the word.

Learn more

Energy reloaded: New construction of the FENECON CarBatteryReFactory

We installed comprehensive security technology in the CarBatteryRefactory—from fire alarm and access control systems to video surveillance. This ensures that all processes related to the reuse of vehicle batteries are reliably protected.

Learn more